Myer Icon Complex

Project value of over $5m in total. Included a 5000kgs goods lift, 16 escalators, 4 passenger lifts and at one point a 24/7 installation program.

Macq 01 Hotel

We were pleased to have been part of Tasmania’s first storytelling hotel. A 4.5 star hotel, we provided an alternate solution involvinga shallow lift pit on a suspended wharf slab. 

MONA Pharos

The provision of a specialised lift to accommodate EWP equipment within the confines of an allocated space that was insufficient both vertically and dimensionally.

Devonport Living City

Northern project showcasing 6 conjoined escalators and 5 lifts, including a 5000kgs industrial lift with external entry points which endures severe coastal elements.

Private Art Gallery - Mercury

An exceptionally challenging brief that required a completely bespoke lift housed into a black ertalon sill (specifically made for the site) that offers private guests with a unique experience.

CROWNE PLAZA HOBART

Existing tenancies below and design constraints to the current building structure resulted in provison of 2 custom designed lifts and two passenger lifts for the newly completed Crowne Plaza.

Noosa Heads QLD

This lift has the lowest overhead known in Australia at 2800mm, for an MRL. This allowed the client to provide vertical access to their holiday home, from an underground carpark, without compromising speed or convenience.

Pumphouse Point

This project was an existing facility built over the World Heritage Lake St Clair precinct. Well considered architecturally, the brief required limited space constraints. We were able to resolve a suitable solution that combined tight budgets with a high end finish to deliver a result that was highly regarded by the client.

Parliament Square

Installing 8 lifts with a large variation of requirements, from low overheads, to heritage listed shaft elements incorporated into the design, with offices, car parks, Marriot Hotel requirements and interruptions due to heritage elements being uncovered. This project has multiple facets that we have planned for completion by 2020.

Freycinet Lodge

The existing lodge was elevated above ground within the constraints of a world heritage site. A construction of a lift was required and pit to suit, located off the side of an internal walkway. We addressed these issues by working collaboratively with the client and architects, Liminal Studio.

Mersey Hospital ICU

Four lift upgrades to the ICU section with ongoing hospital operation and the outbreak of the Covid 19 pandemic. 